Thermo Air worked with the end client to replace an existing swimming pool AHU. This included the design, strip out of the old unit and installation of new, including new duct connections and controls. The unit was delivered in sections to allow for access to the plant room.

There is a noticeable increase in air quality, with no condensation forming on building windows, walls or ceiling. The controls system provides temperature and humidity monitoring for center manager, while operating independently via weekly time programme.

Client: Arklow Bay Hotel and Leisure Club

Services:  Design, Build, Strip out works, installation, commissioning and system training for end client

AHU Components: Swimming pool Supply and Extract AHU c/w Plate Heat exchanger, LTHW coil and Reliable control’s

Year 2017